mine is still sitting in the garage waiting for a little nicer day to get started painting and reinstalling everything that was taken off for the new body and a little stretch
I need:
small air tank
23"-25" brakeline
Attachments
100_1423 (Small).JPG (59.39 KiB) Viewed 15696 times
7 time consecutive motorcycle points series winner
Actually I could always work on my bike. But yes, it's hopefully ready to go. I rewired it and had the head rebuilt. So now I need to get out to the fun drags so I can make sure everythings running alright. I really need to paint my bike but I have to be in the mood to do that. Wow. I see you've done a lot to yours. Are you going to have the same type paint job on the body. I always thought thats green looked good.
"Life is not a journey to the grave with the intention of arriving safely in a pretty and well-preserved body, but rather, skidding in broadside, thoroughly worn out and loudly proclaiming... Wow! What a Ride!"
glad to hear ur doing good, ya still helpin vince 2-3 times a week. when you getting your bike painted? ur still at air gas i see, i've seen your truck there a few times.
Jimmy how is the bike coming along? With the way the weather is looking I sent my carb's to FBG for new needles and to get rebuilt, He's supposed to fix my high rpm lean out problem.
joe p